Queue
What is next on this site, in order.
-
Waiting
Words the flows needed beyond the blueprint (the report and block sheets, the moderation notices, the case decision and its options, "This conversation is closed"): check them with the client before the copy is final.
Waits for The client.
-
Waiting
Letters the flows show as a site notification for want of a letter: "delivered", "published after staff review", and the paid order of a direct delivery.
Waits for Q-028 (which events notify by email or push).
-
Waiting
What the administrator’s resolution of an inconclusive check does to the listing: the Sell flow draws Publish or Reject, Key screens draw Authentic or Not authentic.
Waits for Q-009.
-
Deferred
The hub arrival date: Key screens say 24 Oct, the App layout and the flows 26 Oct; align when Key screens are next touched.
Waits for The next change to Key screens.
-
Deferred
Not found at phone width: four of the desktop frames scroll inside themselves at 390 px (the page itself does not scroll sideways).
Waits for A pass over the Not found layouts.
-
Waiting
Reserve components into screens: currency selector and seller type (the countdown now runs in the Offer and Buy flows).
Waits for Q-002 and Q-021 (currency), Q-011 (seller type).
-
Waiting
Next.js hosting: left to DevOps (SC-003); the Technology page and the Architecture diagram follow their choice.
Waits for DevOps.
-
Outside this site
Follow-ups outside the showcase: the WBS estimate for three codebases and Next.js in the blueprint’s brief.
Waits for The team and the client; the blueprint is changed through /blueprint.
-
Skipped on purpose
Microcopy and tone (SC-017): no voice page is made; the product’s words live in the states, emails, screens and flows.
Waits for The operator, only if asked.
Open questions that block screens or flows
From blueprint/OPEN-QUESTIONS.md. Until each is answered the showcase draws the provisional choice and says so on the page; none is decided here.
| Question | Blocks | Drawn meanwhile |
|---|---|---|
Q-001 who pays the commission, and at what rate | Price breakdown, the seller’s net, the payout card, the admin’s fee settings | Fees as settings with sample amounts |
Q-004, Q-008, Q-009 when authentication is required; what an edit does to a result; what follows a failed or inconclusive one | Seller listing flow, the listing editor, the rejected-listing screen | Authentication on every listing; failed and inconclusive shown, with no resubmit path |
Q-005, Q-014 who chooses and pays for inspection; what can be inspected; how long it takes | Checkout, the hub-inspection flow, order detail | Inspection chosen by the buyer at checkout for a fee |
Q-006, Q-017, Q-016 when the seller is paid; charge or authorise; who bears a chargeback | Order timeline wording (principle 4), payout screens, the payments flow | Paid when the order completes; the buyer is charged at checkout |
Q-010 categories, brands, the condition scale, whether the serial number shows | Filters, the listing editor, the listing page | Placeholders in sample.mjs |
Q-015, Q-018 whether an accepted offer reserves the item; who may cancel and until when | Offer-to-checkout flow, the countdown, order detail | A reservation with a countdown; cancellation before shipment |
Q-022, Q-029 refund fees, the inspection fee on a return, return deadlines and who pays shipping | Return and dispute flow, case screens | A case that ends in a full refund of the item |
Q-024, Q-033 taxes and duties in the checkout total; who issues which tax document | The checkout total, the payouts and documents screens | No tax line |
Q-026 when a buyer may rate | The rating flow, the order’s last step | After completion only |
Q-003 can one account buy and sell | The account switcher in the app shell, onboarding | One account, seller onboarding on top |
Q-002, Q-020, Q-021 launch countries, carrier and customs, seller payout currency | Shipping screens, currency choices, languages | Up to three currencies, two languages (D-001) |
Q-032 which accessibility standard and level | The audit, and the contrast and target-size rules on Design | Contrast rows at AA; targets at 40/44 |